A green dot means the health endpoint answered. It says nothing about whether the stream was complete, whether the error was typed correctly, or whether the model you asked for is the model that ran. Across 51 upstream sellers, most of the incidents we have handled never turned the dot red.
finish_reason: the client keeps waiting or returns a half sentence.Four numbers per upstream, per minute: request count, error count split by class, p50 and p95 latency, and a completeness flag from the stream validator. The completeness flag is the one that matters — it is the only signal that catches truncation, and it comes from parsing the response, not from the socket closing.
Once you score channels, the ranking should drive routing and should be visible. A public board that shows which channels are degraded is useful to customers; a board that only shows "operational" is decoration. We keep the status board and the price table on the same domain so a buyer can see both before signing up.
Do not alert on "channel down". Alert on "completeness flag below 99% for ten minutes" or "p95 latency doubled against the seven-day baseline". Both fire before customers notice, and both are actionable — you demote the channel and traffic moves, no incident call required.
LONG AI publishes the board it uses for routing decisions: 103 models live, 51 upstream sellers, automatic failover to the next channel. The status page and the price table are both public.
The engineering notes behind this — routing, billing order, protocol checks.
Six checks before you switch to another API reseller — the buyer-side version.